The Great Climate Con Map Room

UK Solar Farm Map: 2,898 Solar Farms, 57.3 GW

Every ground-mounted solar farm in the UK that is built, being built or planned, on one map.

They told you the sky was falling and that the only way out was to carpet the countryside in glass. It isn't, and it wasn't. The climate is doing fine, CO₂ is plant food, and we live in the most comfortable, best-fed age in history. That's worth being grateful for.

What isn't fine is what's happening to our fields. The government's own Renewable Energy Planning Database lists 1,241 ground-mounted solar sites already operating, and well over 1,600 more being built, consented or in planning. 79% of these sites, and 81% of their capacity, sit on land that Copernicus CORINE Land Cover mapped as farmland before the panels went in. In 2025 UK solar delivered just 11% of its capacity. So here they all are on one map. Find the ones near you, see who's behind them and how big they are, and make sure your voice is heard before the next one goes in.

Operational

1,241

farms · 11.1 GW

Under construction

157

farms · 3.6 GW

Consented or in planning

1,500

farms · 42.6 GW

On farmland

79%

of sites · 81% of capacity

Colour by

Loading the map…

Green dots sit on land mapped as farmland before the panels. The coloured dot in the popup is the farm's status. Bigger dots are bigger schemes. A white ring marks a Nationally Significant Infrastructure Project, decided by ministers, not your local council. Tap a number to zoom in, tap a dot for details.

Source: Department for Energy Security and Net Zero, Renewable Energy Planning Database, Q3 2026 extract (published 13 November 2026). Ground-mounted and floating solar schemes over 150 kW; home rooftop panels are not included. Capacity totals count sites with a capacity listed; 8 sites with no location are counted but not plotted. Botley West is shown as refused, following the government's decision on 10 November 2026. Land before: Copernicus CORINE Land Cover (2006 edition for operating sites, 2018 edition for the rest), at each site's mapped point; farmland means arable, pasture and other agricultural land.

Continue your learning at Thegreatclimatecon.com

Support the work

Keep This Map Free

This map and every fact on this page are funded by supporters like you. Chip in and help us keep exposing the true cost of net zero.

Join the movement

Follow The Climate Con

Get new maps, facts and articles the moment they drop. Join a movement 150,000+ strong.

The facts behind the map

Why Solar Farms Are A Bad Deal For British Farmland

Every dot on this map is a field that could be growing food. Here’s what the official figures say those panels actually deliver, what they cost you, who owns them and what’s queuing up next. Every figure links to its source.

Capacity factor

11%

UK solar delivered just 11% of its rated capacity across 2025. Panels rated for a full field of power spend most of the year producing a fraction of it, and nothing at night.

Winter output

4.45%

Between October and December 2025, UK solar ran at a load factor of 4.45%. When demand peaks on cold, dark evenings, the panels have next to nothing to give.

On farmland

79%

79% of the solar farms on this map, and 81% of their capacity, sit on land that was farmland before the panels went in.

The queue

42.6 GW

Ground-mounted solar consented or in planning: 27.5 GW approved and waiting, 15.1 GW still in planning. That’s almost four times the 11.1 GW already operating.

The giants

21,469 ha

The 18 schemes of 500 MW or more would cover about 21,469 hectares between them, roughly 53,000.0 acres. None has been built yet.

Best farmland

314 ha

Botley West would have sterilised about 314 hectares of best and most versatile farmland for over 40 years. Ministers refused it on 10 November 2026.

Guaranteed price

£65.23

The guaranteed price per MWh (2024 prices) handed to 157 new solar projects, 4.9 GW in all, in the latest Contracts for Difference round in February 2026.

Old subsidy

£661m

Value of the 9.08 million Renewables Obligation certificates issued to solar in one year (April 2024 to March 2025), at £72.77 each. That’s about £106 for every MWh generated.

Grid gridlock

35.9 GW

Ready-to-go solar the grid operator could not fit into its new connection queue. The old queue had grown to over 700 GW, four times what is needed by 2030.

The pipeline

Four Times More On The Way Than Running Today

The government’s Renewable Energy Planning Database lists 1,241 ground-mounted solar farms operating today, 11.1 GW between them. Behind them sit 157 being built, 1,123 with permission and 377 more in planning. That is 42.6 GW consented or in planning, almost four times what is running now.

Most of it lands on farms. 79% of the sites on this map, and 81% of their capacity, sit on land that Copernicus CORINE Land Cover mapped as farmland before the panels went in. Switch the map to the Farmland view to see them in a separate colour.

StatusSolar farmsCapacityOn farmland (sites / capacity)
Operational1,24111.1 GW89% / 92%
Under construction1573.6 GW73% / 88%
Consented, not yet built1,12327.5 GW71% / 78%
In planning37715.1 GW73% / 75%
Total2,89857.3 GW79% / 81%

Capacity counts sites with a capacity listed. Farmland shares are for the 2,890 sites with a map location. Not every consented scheme gets built.

How fast it’s growing

From 94 MW To 23 GW In Sixteen Years

At the end of 2010 the whole of the UK had 94 MW of solar. By the end of 2025 it had 22,084 MW, and by September 2026 about 23.4 GW. Subsidy cuts slowed things after 2016, but the rush is back: more was added in 2025 (2,652 MW) than in any year since 2015.

The big solar farms are where the land goes. Sites of 25 MW or more made up just 34 MW in 2013. By the end of 2025 they totalled 4,892 MW, and the 18 giants in the queue below would add more than double that again.

Year endAll UK solarAdded that year
201094 MW
20111,010 MW+916 MW
20121,775 MW+765 MW
20132,919 MW+1,144 MW
20145,600 MW+2,681 MW
20159,909 MW+4,309 MW
201612,008 MW+2,099 MW
201712,883 MW+875 MW
201813,184 MW+301 MW
201913,497 MW+313 MW
202013,808 MW+311 MW
202114,271 MW+463 MW
202215,140 MW+869 MW
202317,552 MW+2,412 MW
202419,432 MW+1,880 MW
202522,084 MW+2,652 MW
September 202623,400 MW+1,316 MW so far

Source: DESNZ, Solar photovoltaics deployment (Energy Trends 6.3). Includes rooftop panels. DESNZ revises these figures as late registrations come in.

Summer power, winter famine

Panels Go Quiet Just When Britain Needs Them

Solar output follows the sun, not demand. In 2025 UK solar generated 20,125 GWh, and 76% of it came between April and September. From October to December it managed just 2,122 GWh, about a quarter of the spring quarter, with a load factor of 4.45%.

Load factor is the share of the panels’ rated output they actually produce. At 4.45%, a 500 MW solar farm averages the output of a 22 MW power station running flat out, and on a winter evening it produces nothing at all. Something else has to be kept on standby for every one of those hours.

QuarterSolar generationLoad factor
January to March 20252,653 GWh6.24%
April to June 20258,412 GWh19.13%
July to September 20256,938 GWh15.10%
October to December 20252,122 GWh4.45%
January to March 20262,658 GWh5.58%
April to June 20268,434 GWh17.49%

Source: DESNZ, Energy Trends section 6 (table 6.1, quarterly). Load factors are on an unchanged configuration basis.

The giants

Eighteen Schemes Bigger Than Anything Built So Far

The biggest solar farm running in the UK today is Cleve Hill in Kent, at 373 MW. Waiting in the queue are 18 schemes of 500 MW or more, 10,771 MW and about 21,469 hectares between them. Every one is a Nationally Significant Infrastructure Project decided by a minister. 9 have already been consented (5,171 MW) and the other 9 are in planning. Six are in Lincolnshire.

Each scheme name below links to its official Planning Inspectorate page, where you can read the application, the examination documents and, for live cases, find out how to register your views.

SchemeDeveloperCapacitySite areaCountyStatus (date)
Great North Road Solar ParkElements Green800 MW1,765 haNottinghamshireIn planning (applied 27/06/2025)
Springwell Solar FarmEDF800 MW1,280 haLincolnshireConsented 08/04/2026
Tween Bridge Solar FarmRWE800 MW1,831 haSouth YorkshireIn planning (applied 26/08/2025)
Meridian Solar FarmDowning Renewable Developments750 MW1,616 haLincolnshireIn planning (applied 15/04/2026)
Whitestone Solar FarmNet Zero One Ltd750 MW1,488 haSouth YorkshireIn planning (applied 03/07/2026)
One Earth Solar FarmØrsted and PS Renewables740 MW1,409 haNottinghamshireConsented 08/07/2026
Cottam Solar ProjectIsland Green Power600 MW1,451 haLincolnshireConsented 05/09/2024
Gate Burton Energy ParkLow Carbon531 MW824 haLincolnshireConsented 12/07/2024
East Pye Solar FarmIsland Green Power500 MW1,212 haNorfolkIn planning (applied 02/04/2026)
Green Hill Solar FarmIsland Green Power500 MW1,201 haNorthamptonshireConsented 08/10/2026
Heckington Fen Solar ParkEcotricity500 MW586 haLincolnshireConsented 24/01/2025
Light Valley SolarIsland Green Power500 MW1,270 haWest YorkshireIn planning (applied 09/03/2026)
Lime Down Solar ProjectIsland Green Power500 MW1,237 haWiltshireIn planning (applied 17/10/2025)
Longfield Solar FarmEDF Renewables500 MW453 haEssexConsented 26/06/2023
Rosefield Solar FarmEDF500 MW675 haBuckinghamshireIn planning (applied 23/10/2025)
Sunnica Energy FarmSunnica500 MW981 haCambridgeshireConsented 12/07/2024
The Droves Solar FarmIsland Green Power500 MW840 haNorfolkIn planning (applied 16/12/2025)
Tillbridge Solar FarmTillbridge Solar Ltd500 MW1,350 haLincolnshireConsented 14/10/2025

Source: DESNZ REPD, Q3 2026, which gives the developer, the site area and the decision dates. Botley West (840 MW) is left out, as the government refused it on 10 November 2026.

Where they’re going

The County League Table

Lincolnshire tops the table with 108 solar farms and 7,528 MW, and 7,116 MW of that is not built yet. Nottinghamshire is next, with 89% of its 74 sites on land that was farmland. Devon has the most sites (135), but most are small.

By nation: England 2,396 sites (50.5 GW), Scotland 239 (3.6 GW), Wales 223 (2.7 GW) and Northern Ireland 39 (0.4 GW).

CountySolar farmsCapacityNot yet builtSites on farmland
1. Lincolnshire1087,528 MW7,116 MW82%
2. Nottinghamshire743,546 MW3,204 MW89%
3. Cambridgeshire822,395 MW1,774 MW84%
4. Essex932,264 MW1,613 MW84%
5. South Yorkshire272,249 MW2,237 MW44%
6. Norfolk1012,246 MW1,863 MW81%
7. Oxfordshire662,074 MW1,764 MW80%
8. Wiltshire921,947 MW1,316 MW79%
9. Kent771,623 MW908 MW86%
10. North Yorkshire751,545 MW1,399 MW81%
11. Northamptonshire621,468 MW1,295 MW85%
12. East Riding of Yorkshire351,341 MW1,336 MW63%

Top 12 counties by capacity, all statuses, from the sites on this map. Sources: DESNZ REPD, Q3 2026 and Copernicus CORINE Land Cover. South Yorkshire’s lower farmland share partly reflects where REPD places its map pins.

Food or panels

The Best Farmland Is Meant To Be Protected

England grades farmland from 1 (excellent) to 5 (very poor). Grades 1, 2 and 3a are the “best and most versatile” land, the fields that grow the most food. Natural England’s guidance says councils should use poorer-quality land in preference to higher-quality land, and must consult Natural England on any non-farm scheme that would lose 20 hectares or more of it.

In practice the panels keep coming. At Botley West, 314 hectares of best and most versatile land, 42% of the panel area, would have been taken out of arable food production for over 40 years, according to the government’s decision letter. Developers often promise sheep grazing between the rows. The decision letter said that grazing would not mitigate the loss.

Across this map, 89% of operating solar farms and 77% of the capacity consented or in planning sit on land that was farmland. Read more: Save our farmers and They are coming for the food.

Who pays

Guaranteed Prices, Paid Through Your Bills

New solar farms bid for Contracts for Difference: a guaranteed price for every MWh they generate, topped up from bills whenever the market price is lower. In the February 2026 round (AR7a), 157 solar projects totalling 4,905 MW won contracts at £65.23 per MWh in 2024 prices, for delivery from 2027/28. England took 4,247 MW of that.

Older solar farms sit on the Renewables Obligation. In the year to March 2025, Ofgem issued 9,078,175 certificates to 922 solar stations for 6,250,691 MWh, about 1.45 certificates for every MWh. At £72.77 each, that is roughly £661 million in a single year. Suppliers buy the certificates and the cost is passed on to customers. Read more: Renewable energy is creating fuel poverty.

SchemeWhat solar getsPaid for by
Contracts for Difference (AR7a, 2026)£65.23 per MWh guaranteed for 157 projects, 4,905 MWElectricity bill payers
Renewables Obligation (2024 to 2025)9.08 million certificates for 922 stations, about £661mElectricity bill payers
Administrative ceiling (AR7a)Up to £75 per MWh was on offerSet by government

The grid queue

More Solar Than The Grid Can Take

For years, anyone could join the queue for a grid connection. It had grown to “over 700GW, four times what’s needed by 2030”, according to the National Energy System Operator. NESO has now re-ordered it into a pipeline of 283 GW of generation and storage and 99 GW of demand.

That still left 217 GW of ready projects without a priority place, including 35.9 GW of solar. Meanwhile, solar already connected is being paid to switch off when the wires are full.

Who profits

Foreign States And Big Developers Own The Giants

One developer, Island Green Power, is behind six of the 18 giant schemes: 3,100 MW across about 7,211 hectares. EDF, wholly owned by the French state, is behind three more. Ørsted, majority owned by the Danish state is a partner in One Earth, 740 MW in Nottinghamshire. The guaranteed prices are paid by British bill payers; the returns flow to the owners.

DeveloperGiant schemesCapacitySite area
Island Green PowerCottam, Green Hill, Lime Down, East Pye, The Droves, Light Valley3,100 MW7,211 ha
EDF (French state owned)Springwell, Longfield, Rosefield1,800 MW2,408 ha
RWETween Bridge800 MW1,831 ha
Elements GreenGreat North Road800 MW1,765 ha
Ørsted (Danish state, 50.1%) with PS RenewablesOne Earth740 MW1,409 ha

Your voice

Who Decides, And How To Object

Government energy policy says a solar farm needs between 2 and 4 acres of land for every MW (National Policy Statement EN-3, as quoted by the Planning Inspectorate). On that basis, the 42.6 GW consented or in planning would take roughly 85,000 to 170,000 acres. In all, 36 of the schemes on this map took the ministerial route, and the white rings on the map show where they are.

Local voices do count. Botley West drew 1,115 representations before ministers turned it down, and residents elsewhere have won their fight. Here is how to take part, step by step, using the official process.

  1. Find out who decides. Over 100 MW in England, it is a minister after a Planning Inspectorate examination (threshold since 31 December 2025). Smaller schemes go to your local council. Click any dot on the map to see its planning authority.
  2. Speak up early. Developers of big schemes consult before they apply. Responses at this stage can change the plans before they reach the Inspectorate.
  3. Register in time. Once a big scheme is accepted, registration to have your say is open for at least 30 days. Miss it and you lose your formal voice. Use the scheme’s Planning Inspectorate page.
  4. Take part in the examination. It can last up to 6 months. Registered people can send written comments by the deadlines and anyone can attend the hearings.
  5. For council applications, the comment period is not less than 21 days from publicity, or 14 days for a newspaper notice (government guidance). Object in writing, on planning grounds: loss of farmland, landscape, flooding, traffic, heritage.
  6. After a minister decides, there is a 6 week window to challenge the decision in the High Court by judicial review.

Questions

Solar Farm Map FAQs

Are rooftop panels on this map?

No. The map shows ground-mounted and floating solar farms from the government’s Renewable Energy Planning Database, which covers schemes over 150 kW. The 23.4 GW UK total above does include rooftops.

Why does the map say “farmland”?

Each site is checked against Copernicus CORINE Land Cover mapping from before the panels went in. If that land was arable, pasture or other farmland, it shows in the farmland colour.

Does a consented solar farm always get built?

No. Some wait years for a grid connection or a subsidy contract, and some are never built. That is why the map separates consented from operational.

How long do solar farms stay?

For decades. At Botley West, the government said the farmland would have been sterilised for over 40 years.

Do solar farms work at night or in winter?

Not at night. In winter they produce very little: UK solar ran at a load factor of 4.45% from October to December 2025 (DESNZ).

My local scheme is missing or wrong. What do I do?

The database is updated every quarter and can lag behind. Email us at info@thegreatclimatecon.com with the scheme name and planning reference and we will check it.

Report a site

Spotted a site that’s missing or wrong?

Continue Your Learning

Did you see what happened with Scottish wind farms?

The book

The Beginners Guide To The Climate Con

“Excellent book” ~ Paul Burgess. Available in hardcopy.

Help defeat the Climate Con

Become a member for just £2.99 a month and get full access to exclusive tools, content and community.

Cancel anytime • Instant access

Secure checkout • Stay as long as you like

The Climate Con

Sign up to our newsletter

The latest updates from The Climate Con, straight to your inbox.

No spam, unsubscribe anytime. We use Brevo as our marketing platform; by subscribing you agree your details are sent to Brevo for processing under their terms of use.

Continue your learning at Thegreatclimatecon.com